Pictured above is the New Martinsville City Building featured in the West Virginia Municipal Calendar 2013 Month of September

Home | City Hall | Fire Police Location  

City Council | Electric Dept. | Parks & Recreation Dept. | Water & Sewer Dept. | Hannibal Hydro Plant

Water & Sewer Department Ph: 304-455-9110 Fax: 304-455-4974

Maintenance Shop Ph: 304-455-9146 

Sewer Plant Ph: 304-455-9141

Emergency after hours call the New Martinsville Police Department 304-455-9100
For underground utility locations contact WV Miss Utility 1-800-245-4848

Pay & View Utility Bills Online

  Pay Water Bill Online

  1. Select the pay bill link. You will go to PSN, our payment processor.
  2. Select register.
  3. Follow the prompts to register and then make a payment. Future payments are just 3 steps!
  • Pay immediately, schedule a payment or set up Auto-Pay
  • Please opt out of paper bills
  • Print receipts, view payment history
  • Convenience fees apply to payments

The New Martinsville Water and Sewer Department is in accordance with West Virginia Public Service Commission regulations. It serves water to approximately 3500 residential and commercial customers.  The organizational structure includes the city councils and water board.

New Martinsville Water and Sanitary Sewer Department has a board that is made up of 5 members and a secretary. The board holds their regular meeting on the 4th Monday of the month at 6:00 pm at City Hall 

The New Martinsville Water and Sanitary Sewer Department consists of three divisions which are organized under the Superintendent. Superintendent has an office at city hall where he has an administrative assistant.

The Distribution Department is managed with a foreman and assistant foreman and is responsible for all field service work. The foreman has responsibility to have his crew maintain all water lines, fire hydrates maintenance and repairs, and meter installations and repairs. The also maintain sewer lines through town, working on plug sewers and camera sewer lines. The foreman maintains a crew of 6 that take care of water and sewer repairs and improvements.

Patrick Durant
Superintendent
nmwater@newmartinsville.com
Paula Gump
Administrative Assistant
newmartinsvillewater@yahoo.com
Gary Young
Operations Foreman
Donzel Hornbeck
Foreman

The department currently has:

Water Certifications:

3 Class III Operators
1 Class II Operators
2 Class 1 Operators
9 Water Distribution Operators
6 Backflow Operators

Wastewater Certifications:

9 Wastewater Collections

Employees maintain their certification through continuing education hours. The work experience of personnel ranges 1yr. 34yrs. 

The Distribution Department is located at 203 Wetzel Street.

The Water and Sewer has one Water Operator which is responsible for the water system.  The New Martinsville Water Department is a groundwater system and its current water supply is from five (5) wells drawing its water from the Alluvial Aquifer. The wells have an average daily production of about 1.2 million gallons or about 38 million gallons a month. With the water coming from an underground source, great care must be maintained to protect and eliminate any contamination that can come from land usages and activities within the well fields. The City is fortunate to have great quality water and the water department at the current time is only required to add chlorine to its water before it is distributed to its customers. The water is routinely monitored for over ninety (90) different contaminates. If there is ever a question or concern about the water or water quality you are encourage to contact the New Martinsville Water Department.

The Treatment Department is manage with a Waste water Chief Operator and is responsible treat wastewater from over 3000 residential and commercial customers. The city of New Martinsville operates the collection and treatment system in accordance with the National Pollutant Discharge Elimination Systems (NPDES) Permit Number WV0027472.
The plant has a 2.3 mdg capacity flow, utilizing an extended aeration activated sludge process for biological treatment and ultraviolet irradiation process for disinfection of the wastewater. Aerobic digestion and belt filter press processes are used for sludge handling.

The combined collection system is comprised of many thousands of feet of gravity and force main sewer piping of various sizes ranging from 4 inch through 24 inch, 593 manholes, 7 lift stations.

The wastewater plant is comprised of a mechanical bar screen, a manual bar screen, vortex grit removal, 2 rotor aerated oxidation ditches with a volume of 600,000 gallons each, 2 clarifiers with a volume of 191,500 gallons and surface area of 1,963 sq. ft. each, ultraviolet disinfection, a parshall flume flow measurement device, an aerobic digester with a volume of 153,000 gal, a 1.5 meter sludge dewatering belt press, and 2 emergency storage tanks.
The operation and maintenance of the treatment plant must be supervised or performed by a certified operator possessing at least a Class III certificate issued by State of WV.
Our system currently employs:
1 Class IV Operations Supervisor
1 Class III Operator
1 Class II Operator
1 Lab technician with 2 other operators being Lab Certified.
Operators also hold other various certifications and maintain their certifications through continuing education hours. The work experience of our personnel ranges from 4yrs. 40 yrs.  

The South Plant is located at 300 S. Main Street

City Council | Electric Dept. | Parks & Recreation Dept. | Water & Sewer Dept. | Hannibal Hydro Plant

 
Home    City Hall    Fire    Police    Location 
 

City of New Martinsville 2015